Lukia Image book

Lukia Image book

2008-04-25

Preparing for Long Cruise


We left Yokohama to the Otaru for fantastic (crazy?) journey. When we arrived to the Otaru Marine Wave, a marina engineer,  Mr. Sasaki, had been perfectly finished the maintenance for our Minor29DC.  He maintained the engine, painted the bottom and changed the zinc. Additionally, he installed the auto-pilot system in the Minor29DC.

He filled the fresh water and fuel to the Minor29DC. Our boat, Minor29DC  was waiting for start.  


Additionally we bought following items for the safety journey.
1) two dram shaped fenders and 13 meters rope.
2) four 18 mm ropes (10m)
3) 40 litters bottled fresh water and some foods enough to drift over one month
(Minor 29 DC has 70L fresh water)

No comments:

Post a Comment